Tsunami
operation in Indonesia
Transitional shelter programme
Part two: A logistical challenge
March
2008 |
|

|
In order to ensure enough timber, the International Federation sourced 32,000 m³ from a UK firm, which then had to travel all the way the International Federation base of operations in Banda Aceh.